March
 

In the beginning of March, the foot of the greenhouse was poured and concrete posts were placed. The land was still very wet, but at least the wheather was fine and the building could start immediately. The place for the warmth storage-tank was piled heavily. The drainage around the greenhouse was dug in and at the end of the greenhouse three big storage silos for rainwater were build. The shed will measure a baluster of 20 meters.

 
 
 
 