In June, the earth in the greenhouse was too dry, so it had to be rained in order to get it smoothened out. This was going to be the last time it was egalized, so it had to be done perfectly to serve as a soid foundation for the new cultivation system. A lot of work was done on the construction of the annex with the office and the canteen. Also in the boiler house progress was made. When the smoothening in the greenhouse was done, the pathway could be constructed.