Directly after the demolishment, heavy rainfalls put constraints on the process of egalizing the land. A drainage was installed to allow the land to dry quicker. Luckily this worked out well and the measurements of the new company could be set out. A path of plates on the wet land was created for the work traffic, because the land was still quite muddy. The greenhouse will be build on piles. At every spot where the greenhouse will be supported a little pole was posted to indicate the measurements. This was a precise job. The piles were pushed into the ground with a crane. The last bit had to be drilled to have every pile end up at the right height.


 

 
 